Home What's New Building the Daylight Daylight Tender Observation Car Engine Stand Gondolas Gauge Bell Ringer Air Pump Gas Switcher Taffy Puller

#49 Running Boards

Back Next

No Running!

Been working on the front pilot, running boards and skirting.  It takes a bit of doing to get everything lined up properly.  Here's a view after I got both running boards and ladders done.

 

I assembled what I had so far and took this picture to show the pilot along with the running boards, etc.  You can barely see it but the bell in installed under the plate directly under the smokebox door.

 

I thought I was done.  The running boards are made of 1/8" aluminum and looked too smooth.  They will be painted black but it just wouldn't look right.  So...  I bit the bullet and got a 18" x 24" sheet of scale diamond plate walkway.  There was a lot of area to cover and just about every inch of the diamond plate was going to be used.  I spent a good hour laying out the running boards, ladder steps, etc.  Made about 20 changes to squeeze it all in and still have the "grain" going the right way.  Here's a picture of the plate pretty much cut up with layout marks on the back

 

It's starting to look better.  The brass diamond plate was rough cut and placed on the running boards.  Still have to custom fit them.  (notice the painted skirting?)

Back Next

#01 So It Began #2 Frame #3 Drivers #4 Quartering #5 Trucks #6 Frame & Wheels #7 Side Rods #8 Cylinder Boring #9 Cyl/Valve Liners #10 Cyl/Valve Cover #11 Pistons & Valves #12 Cyl Assembled #13 Boiler #14 Suspension #15 Crosshead #16 Brakes #17 Link Support #18 Bell #19 Crosshead (again) #20 Connecting Rod #21 Stationary Runner #22 Smokebox #23 Valve Gear #24 Running on Air #25 Piston Rings #26 Axle Pump #27 Plating #28 Lubrication #29 Blast Nozzle #30 Stack #31 Steam Turret #32 Burner Manifold #33 Mounting Brackets #34 Boiler Insulation #35 Jacketing #36 Cab #37 Throttle #38 Reverse Lever #39 Track Test #40 Smokebox Access #41 Electric Blower #42 Turbulators #43 Burner Test #44 Piping #45 Cab (part 2) #46 Inaugural Run #47 Post Steamup #48 Smokebox Lights #49 Running Boards #50 Pilot #51 Skirting #52 Paint #53 Lettering #54 Whistle #55 Skyline Casing #56 Fuel System Mods #57 Odds and Ends #58 Turbos

Home What's New Building the Daylight Daylight Tender Observation Car Engine Stand Gondolas Gauge Bell Ringer Air Pump Gas Switcher Taffy Puller

 

 

Questions or problems regarding this web site should be directed to [spd4454@hotmail.com].
Copyright © 2017, 2018, 2019, 2020, 2021, 2022, 2023, 2024  [Dan's Loco Works]. All rights reserved.
Last modified: 04/06/2018.