Home What's New Building the Daylight Daylight Tender Observation Car Engine Stand Gondolas Gauge Bell Ringer Air Pump Gas Switcher Taffy Puller

#34 Boiler Insulation

Back Next

Keep Me Hot Baby!

After I had all the mounts and bands welded to the boiler, it was time to start cutting the insulation.  I used 1/8" FiberFrax.  Stuff cuts real easy.

Back Next

#01 So It Began #2 Frame #3 Drivers #4 Quartering #5 Trucks #6 Frame & Wheels #7 Side Rods #8 Cylinder Boring #9 Cyl/Valve Liners #10 Cyl/Valve Cover #11 Pistons & Valves #12 Cyl Assembled #13 Boiler #14 Suspension #15 Crosshead #16 Brakes #17 Link Support #18 Bell #19 Crosshead (again) #20 Connecting Rod #21 Stationary Runner #22 Smokebox #23 Valve Gear #24 Running on Air #25 Piston Rings #26 Axle Pump #27 Plating #28 Lubrication #29 Blast Nozzle #30 Stack #31 Steam Turret #32 Burner Manifold #33 Mounting Brackets #34 Boiler Insulation #35 Jacketing #36 Cab #37 Throttle #38 Reverse Lever #39 Track Test #40 Smokebox Access #41 Electric Blower #42 Turbulators #43 Burner Test #44 Piping #45 Cab (part 2) #46 Inaugural Run #47 Post Steamup #48 Smokebox Lights #49 Running Boards #50 Pilot #51 Skirting #52 Paint #53 Lettering #54 Whistle #55 Skyline Casing #56 Fuel System Mods #57 Odds and Ends #58 Turbos

Home What's New Building the Daylight Daylight Tender Observation Car Engine Stand Gondolas Gauge Bell Ringer Air Pump Gas Switcher Taffy Puller

 

 

Questions or problems regarding this web site should be directed to [spd4454@hotmail.com].
Copyright © 2017, 2018, 2019, 2020, 2021, 2022, 2023, 2024  [Dan's Loco Works]. All rights reserved.
Last modified: 04/06/2018.